Log in
Business

New plan proposed for Hoa Lac-Hoa Binh route

A fresh investment plan has been proposed for the construction of a road system connecting Hanoi to Hoa Binh province under the build-operate-transfer model.

A proposal from the Ministry of Transport (MoT) just submitted to the prime minister outlines a two-lane Hoa Lac-Hoa Binh route built over 30km starting from an ethnic culture and tourism village in Hanoi’s Son Tay town and linking up to National Highway 6 next to Hoa Binh city.

The proposal also includes expanding Highway 6’s 33km Xuan Mai-Hoa Binh section by two lanes.

Consulting unit estimates show the cost for the route, which would be later upgraded to a highway, at around VND2.138 trillion ($102 million), of which VND566 billion ($27 million) would go into site clearance.

Improving the 33km of Highway 6, including sections through crowded residential quarters, was estimated at around VND341 billion ($16.2 million).

“We are seeking the prime minister’s approval to combine Highway 6’s 33km upgrade with the construction of the Hoa Lac-Hoa Binh route,” said Deputy Minister of Transport Nguyen Hong Truong.

This would put total project costs at around VND3.129 trillion ($149 million).

The project is considered urgent because Highway 6 is the only road linking the northwest region to Hanoi and is quickly deteriorating.

Estimates show that to meet increasing transport demand by 2017, the highway needs to be upgraded to four lanes. It faces a particularly great challenge as the expansion will infringe on the properties of numerous residents.

Since budget capital is not readily available for the project and it is hard to access ODA, the MoT is proposing the project be conducted under the build-operate-transfer (BOT model) with all funding provided by the investor.

The investor will be granted the right to place two toll stations on Highway 6 and collections could begin immediately after the upgrade slated for 2015.

One station would be set up on the Hoa Lac-Hoa Binh route with collections starting when it opens hopefully in 2017.

Considering the toll price, the MoT proposed the government apply a fee similar to that of National Highway 1’s BOT projects, where the fare exceeded the MoT’s cap by 3.5 times.

With these conditions, investment could be recouped within 29 years.

Under the new plan, the road system connecting Hanoi and Hoa Binh would have four lanes, similar in scope to the Hoa Lac-Hoa Binh highway project that developer Hanoi Import Export JSC (Geleximco) withdrew from in August 2013.

After the project’s investment spiked to VND18 trillion ($857 million), Geleximco sent a document to the prime minister asking they be allowed to stop their involvement as they would not be able to recoup their investment.

According to a MoT source, other local investors have since showed interest in the project, even Geleximco has renewed interest after changes to the project’s plan and model.

“This is actually a solution for both the MoT and investors when it comes to the successful upgrade of this important road system,” said a transport expert.

Reactions:
Share:
Trending
Most Viewed
VNPT enters global AI race with new dedicated unit

VNPT enters global AI race with new dedicated unit

Vietnam’s leading telecom group VNPT has launched a dedicated AI company to commercialize Vietnamese-made artificial intelligence products and expand into major international markets.

Vietnam launches AI, semiconductor training centers

Vietnam launches AI, semiconductor training centers

New AI and semiconductor training centers are now open in Vietnam, aiming to boost hi-tech talent, research strength and integration into the global supply chain.

Vietnam explores low-altitude economy as drones reshape agriculture and urban services

Vietnam explores low-altitude economy as drones reshape agriculture and urban services

From farmlands and delivery routes to traffic monitoring and emergency response, unmanned aerial vehicles (UAVs) are rapidly entering Vietnam’s economic life, opening new growth space as cities and provinces accelerate plans for the low-altitude economy.

Vietnam OCOP Festival 2025 honors products as program marks nationwide development milestones

Vietnam OCOP Festival 2025 honors products as program marks nationwide development milestones

The festival aims to promote and honor outstanding OCOP products and producers and to reaffirm Hanoi’s leading role as the country’s “pacesetter” in the One Commune One Product (OCOP) program.

Vietnam posts five-year high FDI disbursement as investor confidence strengthens nationwide 2025

Vietnam posts five-year high FDI disbursement as investor confidence strengthens nationwide 2025

Despite global economic and geopolitical headwinds, foreign capital flows into Vietnam accelerated in 2025, with investment increasingly concentrated in high value-added sectors, highlighting the country’s growing appeal as a stable, long-term destination for investors.

VN-Index set for 2,200-mark next year: JP Morgan

VN-Index set for 2,200-mark next year: JP Morgan

Vietnam’s appeal goes beyond the upgrade, driven by major economic reforms that are lifting business and consumer confidence, as well as improving profit prospects over the next three to five years.

Vietnam to launch smart agriculture innovation center in Lang Son

Vietnam to launch smart agriculture innovation center in Lang Son

The center is expected to bridge gaps in technology testing, connect farmers with researchers and markets and accelerate sustainable, high-tech agricultural development nationwide.

Hanoi urged to train 100,000 digital engineers through online academy

Hanoi urged to train 100,000 digital engineers through online academy

The Capital Strategic Technology Development Forum gathered a wide range of proposals from businesses, experts and investors on how Hanoi should shape its deep-tech development agenda in the coming decades with a long-term vision to 2045.