Log in
Hanoi

First train of Hanoi’s second metro line undergoes test run in France

The train is expected to arrive in Hanoi in September, instead of July as planned due to the Covid-19 pandemic.

The first train of Hanoi’s second metro line, Nhon-Hanoi Railway Station, is conducting a trial run in France before being sent to Vietnam by the end of 2020, VnExpress quoted a leader of the Hanoi Metropolitan Railway Management Board (MBR) as saying on June 29.

The leader said that the first train has been completed, and calibrated with all the interior hardware installed for the test run in the factory campus in Valenciennes, France.

 A train of the Nhon-Hanoi Railway Station metro line seen in France. Photo: MRB

"The train is expected to arrive in Hanoi in September, instead of July as planned due to Covid-19 pandemic," said the MRB representative.

This is the first of four trains being produced for the line out of a total of ten. The second is now ready for test run and the third has just been completed before arriving in Vietnam in 2021.

The fourth train was produced a month ago, behind schedule due to shortage of equipment.

Work to build the fourth began on May 11 after also being delayed as French factories closed from March 18 to early May. The factories have reopened but have difficulty sourcing parts as supply chains remain disrupted, the MRB said.

Each train will be composed of four or five wagons with a maximum capacity of 950 passengers. It is made of aluminum alloy in accordance with European standards, with a total length of 78.27 meters.

The Nhon-Hanoi Railway Station metro line, the second route after Cat Linh-Ha Dong, spans 12.5 kilometers from Nhon in the western district of Nam Tu Liem through Kim Ma street to the Hanoi Train Station in the downtown area.

It will run 8.5 kilometers on elevated tracks and the remaining four kilometers underground.

Construction was 62% complete as of earlier this month. The elevated tracks have been laid and the elevated sections are 80% complete.

The work was supposed to be finished in September 2017, but delays pushed back the deadline several times.

Hanoi’s first metro line, Cat Linh-Ha Dong, is now in the final stage of safety evaluation with a 20-day test run.

Reactions:
Share:
Trending
Most Viewed
Related news
Hanoi commits US$230 million to curb urban flooding

Hanoi commits US$230 million to curb urban flooding

Emergency construction orders are essential to address urgent needs, including water pollution control, a stable, clean water supply, increased flows for the To Lich River and improved urban landscapes and living conditions.

Hanoi gears up for a vibrant 2026 Countdown

Hanoi gears up for a vibrant 2026 Countdown

With the energy of thousands gathering in Hanoi downtown, the Countdown 2026 promises to be an unforgettable way for people to welcome the New Year.

Hanoi launches AI-powered traffic control center for traffic violations

Hanoi launches AI-powered traffic control center for traffic violations

The system automatically detects common violations, significantly reducing the need for traffic police to be deployed directly on the streets while improving accuracy and transparency in traffic management.

Hanoi plans 10,000-hectare urban megacity with world-class stadium

Hanoi plans 10,000-hectare urban megacity with world-class stadium

The stadium’s design draws inspiration from Dong Son bronze drums and the Lac bird motif, symbolizing Vietnam’s aspiration to rise.

Hanoi greenlights Olympic sports city and Red River boulevard to drive next growth phase

Hanoi greenlights Olympic sports city and Red River boulevard to drive next growth phase

The approval of two landmark projects underscores Hanoi’s push to unlock new growth engines, reshape its urban structure and accelerate its ambition to become a green, smart and globally connected capital.

Hanoi targets 1,200 supporting industry firms by 2030

Hanoi targets 1,200 supporting industry firms by 2030

The city aims to enhance the competitiveness of the capital’s industrial sector by tightening cooperation with Vietnamese enterprises and multinational corporations operating in Vietnam.

Red River Boulevards shape Hanoi’s new growth axis

Red River Boulevards shape Hanoi’s new growth axis

The creation of a landscape boulevard can help Hanoi reconnect with its historic identity shaped by water and restore the river-based character that defined the city for centuries.

Hanoi moves to strengthen urban order and civility

Hanoi moves to strengthen urban order and civility

These include expanding public communication efforts, reorganizing and upgrading streets and sidewalks, maintaining a clean and orderly urban environment and carrying out strict inspections to address violations.