14TH NATIONAL CONGRESS OF THE COMMUNIST PARTY OF VIETNAM
Log in
Hanoi

Germany mega machine TBM ready for Hanoi's subway drilling

The machine was manufactured by German firm Herrenkecht based on the Tunnel Boring Machine (TBM) method.

Part of a boring machine made by Germany has arrived in Hanoi to build the underground section for the city's second metro line, Nhon-Hanoi Railway Station, according to the Hanoi Metropolitan Railway Management Board (MRB).

The MRB said on November 9 that the components of the machine had arrived at Hoang Dieu port in northern Hai Phong city, about a two-hour drive east of Hanoi, in late October.

 The machine was manufactured by German firm Herrenkecht based on the Tunnel Boring Machine method

It is estimated that the assembly of the excavator would take two months, so drilling on the route of the Nhon-Hanoi train station can begin in January 2021.

The machine was manufactured by German firm Herrenkecht based on the TBM method. It stretches more than 100 meters, weighs over 850 tons and has a rotating cutting wheel with a diameter of 6.55 meters. The machine is designed to drill 10 meters of tunnel per day.

According to MRB, the complex apparatus includes a cutting rotor, propulsion cylinder and waste (including soil and rocks) transportation system.

To take the components down to S9, the first of the four underground stations on the Nhon – Hanoi Railway Station route along Kim Ma street in Ba Dinh district, the MRB will employ cranes with a loading capacity of 500 tons to move them one by one.

All the components will be assembled on the site at S9 station to commence work on the four-kilometer underground section of the route, named Metro Line No. 3 though it is currently only the second in the city to start construction after Cat Linh-Ha Dong.

Hanoi’s second metro line, the Nhon-Hanoi Railway Station route, will run 12.5 kilometers from the Nhon area in the western district of Nam Tu Liem via Kim Ma street to Hanoi Railway Station on Le Duan street.

It will run 8.5 kilometers on elevated tracks through eight stations and the remaining four kilometers underground.

The metro line on October 20 received its first train from France and begin operations in April 2021 on the elevated track, which is now 99.5% complete. The underground track is scheduled to begin operations in 2023.

The Nhon-Hanoi Railway Station metro line has a total investment of VND36 trillion (US$1.56 billion), sourced mainly from official development assistance (ODA) loans.

Hanoi’s first metro line, connecting Cat Linh station in downtown Dong Da district to the Yen Nghia station in Ha Dong district, is said to be 99% complete, having missed its deadline several times.

Reactions:
Share:
Trending
Most Viewed
Related news
Hanoi health sector targets digital leap under new Party resolution

Hanoi health sector targets digital leap under new Party resolution

Hanoi sets 2026 as a breakthrough year for healthcare reform, accelerating digital transformation, restructuring hospital networks and tightening food safety management under Politburo Resolution 72.

Hanoi launches state-backed innovation hub to drive digital economy

Hanoi launches state-backed innovation hub to drive digital economy

The new innovation center is designed to connect policy, technology and talent, aiming to accelerate digital transformation, support startups and position the capital as a global testing hub for emerging technologies and creative industries.

ASEAN youth showcase climate innovations at Hanoi exhibition

ASEAN youth showcase climate innovations at Hanoi exhibition

Young innovators from Vietnam and across ASEAN presented practical climate solutions in Hanoi, highlighting grassroots initiatives tackling plastic waste, renewable energy and sustainable livelihoods.

Hanoi issues action plan to implement 14th Party Congress resolution

Hanoi issues action plan to implement 14th Party Congress resolution

The goal is to turn policies into outcomes under the principle of “less talk, more action, effective results to the end, all for the capital and its people.”

ASEAN youth chart next phase of climate action in Hanoi

ASEAN youth chart next phase of climate action in Hanoi

Home to more than 680 million people, many in vulnerable coastal and low-lying areas, ASEAN is on the front line of climate change, facing rising seas, fiercer storms, prolonged droughts and accelerating biodiversity loss that endanger the region’s economic resilience and social stability.

Hanoi launches sweeping overhaul to unlock state economy growth

Hanoi launches sweeping overhaul to unlock state economy growth

Hanoi has unveiled an ambitious five-year plan to reform governance, mobilize public assets and restructure state enterprises, aiming to turn the state economy into a powerful engine of sustainable growth.

Hanoi puts people first in implementing four strategic Party resolutions

Hanoi puts people first in implementing four strategic Party resolutions

Hanoi launches comprehensive action plans to implement Politburo Resolutions 71, 72, 79 and 80, prioritizing people-centered reforms in education, healthcare, culture and state economic development.

Vietnamese families blend Tet travel trends with enduring traditions

Vietnamese families blend Tet travel trends with enduring traditions

More young Vietnamese families choose travel over staying home during the Lunar New Year holiday, seeking fresh experiences while keeping core traditions intact.